机构地区:[1]长安大学桥梁与隧道陕西省重点实验室,西安710064 [2]西安建筑科技大学理学院,西安710055 [3]浙江省工业设计研究院,杭州310003
出 处:《工程地质学报》2006年第4期513-517,共5页Journal of Engineering Geology
基 金:交通部行业联合科技攻关项目(200235336127);陕西省交通科技重点项目(01-06K)
摘 要:针对软弱破碎Ⅱ类围岩双连拱隧道采用三导洞施工方法的特点,阐述了其安全施工技术要点,实际施工中,就其监测内容及监测结果进行了实时分析,为隧道安全施工提供了依据,长期监控量测结果表明,该隧道结构是安全的,达到了围岩与支护结构体系安全与稳定的要求,所采用的安全施工措施以及信息化施工方法对类似工程具有指导和借鉴意义.Considering the characteristics of Hujiaba double - arch highway tunnel constructed with three pilot tunnels excavated in advance and its large excavation width and shallow buried depth, safety construction measures were put forward such as the grouting from the ground surface, excavating by manpower in the upper bench and blasting in lower bench, blasting with small detonation dose, timely installation of the inverts, and so on. The field monitoring works focused on the following three items: ( 1 ) the displacement of surrounding rock; such as crown settlement, displacement of the ground, displacement of inner surrounding rock ; ( 2 ) the stress and stain of support structure; ( 3 ) the internal force in the mid -partition wall. During construction, monitoring data was analyzed in time. Structural material parameters were analyzed backward and modified in response to the monitoring data in order to guarantee safety construction. The engineering practice has proved the applicability and feasibility of the safety monitoring and informationization construction methods.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249