大型发电厂电气主接线优化方案的研究  被引量:16

Study on Optimized Scheme for Electrical Main Wiring in Large-sized Power Plants

在线阅读下载全文

作  者:陈尚发[1] 

机构地区:[1]浙江长兴发电有限责任公司,浙江省长兴市313100

出  处:《电力建设》2006年第8期23-26,36,共5页Electric Power Construction

摘  要:随着机组容量的增大和输电线路电压等级的提高,大型发电厂电气主接线有待改进和创新,在现有的基础上进行优化,以提高电气主接线的可靠性、灵活性和经济性。大型发电厂电气主接线采用1/2接线的优化方案,可以简化接线,节约投资。但该方案在国内外尚无应用实例,如果要推广应用,有待进一步进行可靠性计算、分析、评估和论证,先行试点,取得经验,逐步推广。With increase of the capacity of units and voltage grade of transmission lines, the main electrical wiring in the large sized power plants has to be improved and renovated. It should be optimized on the existing foundation to improve its reliability, flexibility and economy. The optimized scheme with 1/2 wiring used for the main electrical wiring can simplify the connection and save the investment. But the scheme has no practical example beth in domestic and abroad. If it is intended to be popularized for application, its reliability calculation, analysis, evaluation and demonstration will be further carried out, a trial project will be required for experiences and popularization.

关 键 词:大型发电厂 电气主接线 优化 1/2接线方案 

分 类 号:TM621.71[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象