作 者:殷立宝[1] 崔振东[1] 王力[1] 温智勇[1]
出 处:《广东电力》2006年第7期55-57,共3页Guangdong Electric Power
摘 要:常规燃煤机组在进行甩负荷试验期间,一般需要投油稳燃;广东国华粤电台山电厂3号机组采用等离子燃烧技术,在100%甩负荷后,保留1台装有等离子燃烧器的磨煤机运行,不需要投油即可维持锅炉稳定运行,锅炉不超温、不超压。这个试验扩展了等离子燃烧技术的适用空间,同时也为同类机组使用等离子燃烧器提供了一定的参考依据。As for coal-fired generator sets, oil is generally fried during load rejection test. However, the pulverizer with plasma burner was kept running without any oil during the 100% load rejection test on Unit 3 of Guangdong Guohua Yudean Taishan Power Plant. The temperature and the pressure of the boiler were under control. The application scope of plasma combustion technology is widened through the test, which might also be referenced during using plasma burners in similar units.