南水北调中线引江济汉工程主要工程地质问题  被引量:2

MAIN ENGINEERING GEOLOGICAL PROBLEMS IN "WATER FROM YANGTZE RIVER TO HANJIANG RIVER" PROJECT OF "SOUTHERN WATER TO THE NORTH"

在线阅读下载全文

作  者:陈汉宝[1] 

机构地区:[1]湖北省水利水电勘测设计院,湖北武汉430070

出  处:《资源环境与工程》2006年第4期377-380,共4页Resources Environment & Engineering

摘  要:引江济汉工程是南水北调中线工程的重要组成部分,工程跨越多条河流及湖泊,沿途交叉建筑物100余座,其工程地质问题表现出多样性和复杂性,主要有施工期地下水涌水、涌砂,渠道边坡稳定,渠道渗漏及浸没,渗透变形,软土地基,膨胀土,饱和砂土振动液化和次生环境工程地质等问题。"Water from Yangtze River to Hanjiang River" project is an important component of the middle route of "Southern Water to the North" project. It goes across many rivers and lakes and hundreds of different buildings along the way. The main engineering geological problems occur in diversity and complexity. They are mainly the problems in the construction period such as underground inrush of water and sand, trench slope stability, trench seepage and submersion, seeping deformation, soft soil foundation, dilative soil, and vibration liquefaction of saturated sand. There are also secondary environmental and engineering geological problems.

关 键 词:南水北调 引江济汉 工程地质问题 

分 类 号:P642[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象