真空堆载联合预压法在煤场地基处理中的应用  

Application of Vacuum-Heaped load in Foundation Treatment of Coal Aheap

在线阅读下载全文

作  者:孙亚哲[1] 李彩云 高倚山[1] 杨绪军[1] 

机构地区:[1]华东电力设计院,上海200331 [2]国电泰州发电有限公司,江苏泰州225300

出  处:《电力勘测设计》2006年第4期21-26,共6页Electric Power Survey & Design

摘  要:介绍真空-堆载联合预压法机理,通过该方法在煤场地基处理中的实际应用,分析工程实际中的地表沉降,孔隙水压力,水平位移等的变化规律,从而得出了真空-堆载联合预压法具有提高加荷速率、缩短工期及减少工后沉降等优点的有益结论。The mechanism of vacuum-surcharge Preloading preloading method is introduced herein. Based on the monitoring data of the actual application in foundation treatment of coal aheap, the mechanism of the surface sttlement, settlement in layes, pore water pressure, lateral displacement, and so on, are analyzed here in, and some useful conclusions are drawn: the method mentioned herein has the following advantages: raising the rate of loading, shortening the construction period and decrease the settlement after construction as well.

关 键 词:真空-堆载联合预压 塑料排水板 地表沉降 孔隙水压力 水平位移 固结度 

分 类 号:TU4[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象