东关水利枢纽翻板式活动坝设计  被引量:2

Design of Dongguan Hinge Turn-over Movement Dam

在线阅读下载全文

作  者:王淡善[1] 扈晓雯[1] 

机构地区:[1]华东勘测设计研究院,浙江杭州310014

出  处:《水力发电》2006年第8期46-49,共4页Water Power

摘  要:东关水利枢纽翻板式活动坝是我国自行设计、制造的第一座活动坝,此坝型可有效地减少上游洪水淹没损失及水库泥沙淤积,尤其适合于城区内河道的综合治理,坝顶无需工作桥和交通桥,坝型新颖美观,操作简便安全。结合东关活动坝,对枢纽布置、坝体断面设计以及细部结构等进行了介绍,可供其他类似工程设计参考。DongGuan is the first project with turn-over movement dam designed and constructed by Chinese Engineers. This kind of dam can effectively decrease the loss due to upper-stream flood submerging and reservoir mud-sand fill-up, especially it is proper to harness city freshwater synthetically. It needs no work bridge and traffic bridge on dam top, dam type is novel and beautiful, operation is simply and safe. In this article, the design of hinge layout, dam section and detailed structure of DongGuan turn-over movement dana are recommended, which can be a good reference to similar projects design.

关 键 词:活动坝 翻板式 设计 东关水利枢纽 

分 类 号:TV61[水利工程—水利水电工程] TV641.43

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象