检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汤海雁[1] 武守远[1] 徐桂芝[1] 荆平[1]
机构地区:[1]中国电力科学研究院,北京市海淀区100085
出 处:《电网技术》2006年第16期35-39,共5页Power System Technology
摘 要:甘肃成县-碧口线220kV可控串补(thyristorcontrolledseriescompensator,TCSC)工程是我国第一个可控串补国产化示范工程,甘肃陇南地区电网为典型长线弱送端系统,系统稍有扰动或者增加机组出力,成碧线就会出现低频振荡。介绍了成碧系统采用电力系统稳定器(powersystemstabilizer,PSS)以及TCSC阻尼低频振荡的控制方案,系统试验结果表明,成碧线TCSC可有效抑制低频振荡,且TCSC和PSS之间可以实现协调配合。The thyristor controlled series compensation (TCSC) project for 220kV transmission line from Cheng County to Bikou (abbr. Cheng-Bi transmission line) in Gansu Province is the first domestic-manufactured demonstration project of TCSC in China. The Longnan regional power network in Gansu province is a typical long distance power transmission system with weak sending end, as soon as this system has a little bit of disturbance or the active power output of generating units increases, low frequency oscillation will occur. As the first on-site test to repress low frequency power oscillation by TCSC in the world, the authors propose a control scheme to damp the low frequency oscillation occurred in Cheng-Bi transmission line by use of power system stabilizer (PSS) and TCSC. Results of on-site tests show that by means of TCSC the low frequency oscillation in Chen-Bi transmission line can be effectively repressed and the coordination between TCSC and PSS can be implemented.
关 键 词:低频振荡 可控串补 阻尼 电力系统稳定器 电力系统
分 类 号:TM714.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222