南京长江第三大桥钢箱梁桥面吊机及梁段吊装工程  被引量:32

Deck Derrick Crane,Lifting and Erection of Steel Box Girder Blocks of the 3rd Nanjing Changjiang River Bridge

在线阅读下载全文

作  者:沈斌[1] 谢发祥[1] 

机构地区:[1]南京长江第三大桥建设指挥部,江苏南京210028

出  处:《世界桥梁》2006年第3期19-22,共4页World Bridges

摘  要:南京长江第三大桥钢箱梁吊装采用桥面吊机,吊装的提升、纵横坡及水平位移调整、吊机的移动等操作均通过液压系统完成,操作过程平稳、方便,可自由进行各项微调动作,安装精度高。对南京长江第三大桥桥面吊机的结构、使用和钢箱梁梁段吊装工艺和关键技术作简单介绍。The steel box girder blocks of the 3rd Nanjing Changjiang River Bridge are lifted and erected by deck derrick crane. The lifting, adjusting and shifting of the crane on longitudinal, lateral gradients and in horizontal direction are all completed by the hydraulic system equipped for the crane. The operation of the crane is smooth, easy and can be freely fine adjusted, and precision of the erection of the box girder blocks with the crane is high. In this paper, the structure, utilization of the deck derrick crane and corresponding workmanship and key techniques having been applied to the lifting and erection of the box girder blocks of the Bridge are described in a brief account.

关 键 词:钢箱梁 桥面吊机 吊装 桥梁施工 

分 类 号:U445.46[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象