Research on Coordination Mechanism in Construction Project Organization  被引量:1

Research on Coordination Mechanism in Construction Project Organization

在线阅读下载全文

作  者:Chen Shouke Cheng Hu Wei Zhuobin 

机构地区:[1]School of Civil Engineering, Southeast University, Nanjing 210096 [2]Navy Engineering University, Tianjin 300450

出  处:《工程科学(英文版)》2006年第3期100-110,共11页Engineering Sciences

基  金:The National Natural Science Foundation of China (No.:60272048) ,Natural Science Foundation ofJiangsu Education Department(No.04kjb510057) and China Scholarship Council

摘  要:The construction process of modern project is distributed across teams, departments, or systems, each of which is corresponding to a particular project unit. Conflicts often occur in construction project organization because of the improper coordination amongbetween these project units. The primary reason for coordination puzzle in project organization is generally the diversification of culture and technology. In order to enhance the organization’s performance efficiency, good and effective coordination mechanism aimed at diversification of culture and technology is needed. The relationship amongbetween parties and project units is defined and expressed through contract, so construction project organization usually relies on various contracts to deal with its cooperative partner relationship. However, the contractual mode is a defensive method which is more prone to conflicts than the conglomerate of diversification, especially evaluated from the aspects of culture and value. By culture integration—a more flexible way to make up the shortage of contractual mode, a harmonious atmosphere in which organization members can exert their potential ability can be created to help project administrators mitigate organization conflicts and achieve the common goals of project organization. Based on arbitration theory, moreover, this paper puts forward a combined coordination mechanism-hierarchical coordination and nonhierarchical coordination—to resolve the conflicts resulted from diversification of technology. The introduction of intelligent agents system has the advantage of a more systematic and organizational method in reality without causing unnecessary emotional and the behavioural side effects is an effective instrument to utilize this coordination mechanism and realizes its established goals.The construction process of modern project is distributed across teams, departments, or systems, each of which is corresponding to a particular project unit. Conflicts often occur in construction project organization because of the improper coordination among/between these project units. The primary mason for coordination puzzle in project organization is generally the diversification of culture and technology. In order to enhance the organization's performance efficiency, good and effective coordination mechanism aimed at diversification of culture and technology is needed. The relationship among/between parties and project units is defined and expressed through contract, so construction project organization usually relies on various contracts to deal with its cooperative partner relationship. However, the contractual mode is a defensive method which is more prone to conflicts than the conglomerate of diversification, especially evaluated from the aspects of culture and value. By culture integration-a more flexible way to make up the shortage of contractual mode, a harmonious atmosphere in which organization members can exert their potential ability can be created to help project administrators mitigate organization conflicts and achieve the common goals of project organization. Based on arbitration theory, moreover, this paper puts forward a combined coordination mechanismhierarchical coordination and nonhierarchical coordination-to resolve the conflicts resulted from diversification of technology. The introduction of intelligent agents system has the advantage of a more systematic and organizational method in reality without causing unnecessary emotional and the behavioural side effects is an effective instrument to utilize this coordination mechanism and realizes its established goals.

关 键 词:工程项目 项目管理 调和机制 合同保护 文化冲突 技术冲突 协调模式 文化多样化 

分 类 号:F284[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象