钢管砼顶升法冬期负温施工  

Steel tube concrete column lift-up method construction at negative temperature in winter

在线阅读下载全文

作  者:赵宝德[1] 黄涛[1] 周云麟[1] 

机构地区:[1]鞍钢建设集团有限公司

出  处:《鞍山科技大学学报》2006年第3期287-289,共3页Journal of Anshan University of Science and Technology

摘  要:针对钢管与砼膨胀系数的差异(分别为1.2×10-5/℃和0.7×10-5/℃),阐述低负温(-5℃至-17℃)下钢管砼柱砼顶升法施工原理、热工计算、外加剂选择以及开孔排气、压力灌浆等关键工艺方法步骤。最后,作出砼强度数理统计分析和技术经济效果评述。可供同类结构施工参考。Aimed at difference of expansion coefficient between steel tube and concrete (1.2×10^-5/℃ and 0.7×10^-5/℃ respectively), some key process method and step under low temperature ( -5 ℃ to - 17 ℃ ),scuh as state construction principle of steel tube concrete column lift up, heat count, selection additive agent and cut exhaust opening and draining air, pressure grouting etc were elaborated. Finally, mathematical statistics analysis was made and effect of technology economy was estimated, which can be taken as reference of the same kind construction.

关 键 词:复合外加剂 顶升压力 排气孔 效果评述 

分 类 号:TU511.37[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象