乌江洪家渡水电站泄洪系统岩溶发育特征分析与施工处理措施  

Analysis of karst - developing characters of flood discharge system of Hongjiadu ,hydropower station and summarization of treatment measures

在线阅读下载全文

作  者:张秀宏[1] 

机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550002

出  处:《水电勘测设计》2006年第3期14-18,共5页

摘  要:本文对洪家渡水电站泄洪洞、溢洪道开挖所揭露的岩溶分布情况和特征进行论述,将工程的处理措施加以总结,为今后永久洞室岩溶发育段开挖处理提供参考。The intake of flood discharge system of Hongjiadu hydropower station is located in the elbow area on the left bank, where the stratum is Yongningzhen limestone (Tlynl -5, Tlynl -4) and the stratum outcrop of the outlet is limestone(Tly2-4, Tly2- 3) and dolomitic limestone, and there is well developed karst, so the construction safety and long - term stability of permanent chambers of flood discharge system are strongly impacted on. The paper analyzes karst - developing characters and formation cause of the two permanent chambers on the basis of the statistics of the karst distribution revealed in the excavation of the two permanent chambers of the spillway and discharge tunnel, and summarizes treatment measures and countermeasures during construction, so as to provide reference for excavation of karstdeveloping sections of permanent chamber in the future.

关 键 词:洞式溢洪道 泄洪洞 岩溶 处理措施 

分 类 号:TV641.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象