辽东湾 JZ20-2-S4 异常高压气井漏喷及其井控的处理  被引量:1

Well control treatments for lost circulation and blowout in abnormal high pressure gas well JZ20 2 S4 in Liaodong bay

在线阅读下载全文

作  者:姜伟[1] 

机构地区:[1]中国海洋石油总公司渤海公司钻井部

出  处:《特种油气藏》1996年第2期31-35,共5页Special Oil & Gas Reservoirs

摘  要:针对渤海辽东湾JZ20-2-S4井在钻探过程中打开高压气层后钻遇断层裂缝带,而发生井漏、井涌的复杂情况,并结合该井的特点,在最大立压16.2MPa,套压8.12MPa的情况下,采用常规堵漏剂加重晶石沉淀与注水泥堵漏措施相结合的方法,共耗费重晶石1219t,泥浆1119m3,水泥浆20.37m3,经过20d的工作,取得了压井堵漏的成功。During drilling of well JZ20 2 S4 in Liaodong bay, Bohai Gulf, a fault fracture belt was encountered after drilling into high pressure gas layer, thus resulted in lost circulation and kick. Considering the features of this well, under the condition of 16.2 MPa of stand pipe pressure, 8.12 MPa of casing pressure, the well was successfully killed and plugged by combining cementing with injecting conventional lost circulation additive weighted by barite. The job used 1 219 t of barite, 1 119 m 3 of mud, 20.37 m 3 of cement slurry, and taked the time of 20 d.

关 键 词:异常压力 堵漏 钻井 井漏 井喷 井控 

分 类 号:TE28[石油与天然气工程—油气井工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象