检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京师范大学地理学与遥感科学学院,北京100875
出 处:《水利经济》2006年第5期4-6,24,共4页Journal of Economics of Water Resources
基 金:国家自然科学基金资助项目(49971001);西部重大科学计划成果项目(90102013)
摘 要:从水利风景区的特殊性入手,讨论水利风景区规划的原则和要求、内容和深度、规划成果的审查与实施等问题。认为水利风景区旅游开发规划的时序安排必须与水利工程建设规划相衔接,尤其新建设的水利工程设施,最好在工程施工之前就考虑旅游开发问题,把施工期间的建筑物、管网和道路等与后期的旅游需要融合起来,以节省投资,提高设施的利用率。time sequence arrangement for the development and planning of tourism in water parks should be in accordance with the planning of hydraulic engineering.As for the newly constructed hydraulic engineering facilities,tourism development problems should be taken into account before their construction.The structures,pipe net and roads during the construction period should be combined with the tourism requirements after their completion so as to save investment and raise utilization factor of facilities.From the specialty of water parks,principles and requirements,content,check and implementation of the planning of water parks are discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249