龙滩水电站左岸地下引水发电系统开挖支护  

Excavation and Timbering about the Underground Generating System by Piloting Water of Longtan Hydropower Station

在线阅读下载全文

作  者:黄岗 杨天吉 董发俊 

机构地区:[1]龙滩工程一四七八联营体,广西天峨547300

出  处:《水力发电》2006年第9期57-60,共4页Water Power

摘  要:龙滩水电站左岸地下引水发电系统工程规模浩大,在0.5 km 2的范围内共布置有119条洞室。这些洞室在空间重叠,平竖相贯,形成庞大复杂的地下洞室群,且主要洞室尺寸庞大,其中地下厂房是目前世界上规模最大的地下厂房。龙滩水电站引水发电系统主要洞室的开挖支护方法,可供其他类似工程参考借鉴。The underground generating system by piloting water of Longtan Hydropower Station is huge, which lies on the left bank of Hongshuihe River. There has 119chambers arranges in the 0.5 square kilometers, and these chambers that form huge and complex underground chambers are not only overlapping in space but also interpenetration; furthermore, the major chambers are tremendous, especially the underground main power house, which is, at the moment , is the largest underground main power house of the Longtan hydropower project, and also supplies other similar project reference models.

关 键 词:引水发电系统 开挖支护 研究与实践 龙滩水电站 

分 类 号:TV731.6[水利工程—水利水电工程] TV732

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象