检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史仁杰[1] 柴志阳[1] 翟利军[1] 张绍民[1]
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003
出 处:《人民黄河》2006年第9期15-17,共3页Yellow River
摘 要:西霞院电站厂房地基为第三系软岩,为防止电站坝段的渗透破坏,厂房地基设悬挂式防渗帷幕;为减小不均匀沉降,控制坝段之间的沉降差,在电站下部大体积混凝土部位设置纵向键槽;为克服基础上下游部位的应力集中现象,在基础上下游侧设置素混凝土桩。厂房基础面尽量设计成平面,同时在桩顶设置碎石垫层,防止基础出现集中应力,以改善地基应力分布,提高地基稳定性。The foundation of Xixiayuan powerhouse belongs to Tertiary soft rock. In order to prevent destruction by percola.tion,it builds a suspended impervious curtain in the foundation. It controls the difference of sedimentation between thedam sections and builds longitudinal key bed at the mass concrete under the power station for reducing uneven settle.ment.It builds plain concrete piles both in the upper and downstream of the foundation for avoiding the situation 0f con-centrated. stress happened there.It should try to design the foundation surface as plane and in the meanwhile t0 buildcrushed bedding on top of piles for preventing concentrated stress happened in the foundation,improving the stress dis—tribution and increasing the stability of the foundation.
分 类 号:TV223.3[水利工程—水工结构工程] TV882.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222