检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘保平[1]
机构地区:[1]安钢集团舞阳矿业有限责任公司
出 处:《金属矿山》2006年第10期23-27,共5页Metal Mine
摘 要:针对铁古坑选厂原生产工艺存在的问题,制定了新的技术路线。通过采取原矿多段干式预选抛尾、多碎少磨、阶段磁选抛尾、细筛+磁聚机提质、尾矿中磁扫选等技术及应用高效节能设备,实现了铁古坑低品位难选磁铁矿选矿技术的高效节能化。选矿厂处理能力由74万t/a提高到153万t/a、精矿铁品位由64.05%提高到67.5%以上、铁回收率由64.49%提高到69%左右、选矿电耗由48.1 kW.h/t降至25.8 kW.h/t,可年增经济效益7 500万元以上。In view of the problems existing in the original technological process of Tiegukeng Concentrator, a new technical route was established. Through the adoption of the techniques such as tailings discarding by multistage dry preconcentration, more crushing and less grinding, tailings discarding by multistage magnetic separation, fine screening + quality improvement by magnetic agglomerating machine and tailings scavenging by medium intensity magnetic separation, and the application of high-efficiency energy-saving equipment, the high efficiency and energy saving of the beneficiation technology for Tiegukeng low grade refractory magnetite ore were realized. As a result, the concentrators capacity has been raised from 0.74 Mt/a to 1.53 Mt/a, the concentrate grade from 64.05% to over 67.5% and the iron recovery from 64.49% to about 69%, while the electricity consumption has been reduced from 48.1 kW · h/t to 25.8 kW · h/t,making possible an annual profit increase of more than 7.5 million yuan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249