检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:党黎军[1] 刘剑光[1] 刘超[1] 马晓龙[1] 党小建[1] 赵景涛[1] 刘爱军[1] 雷照团 王红雨[1] 蒋敏华[1]
出 处:《电力设备》2006年第10期44-49,共6页Electrical Equipment
摘 要:介绍了循环流化床(CFB)锅炉本体及系统设计的主要特点,重点分析了大型循环流化床锅炉启动调试中的重要内容及所存在的问题,针对燃烧阳泉无烟煤的HG480/13.7L.MG21型CFB锅炉的调试实践,提出了风量标定、高温烘炉、蒸汽吹洗、炉膛受热面保护、返料器投入时间和方式、主燃料投入、给煤控制和床下点火燃烧器等调试优化方案。The paper briefs the major features of main part and system design of circulating fluidized bed (CEB)boiier;emphatically analyzes the knportant contents and existing problems in the commissioning debugging process of larze size circulating fluidized bed boiler;in view of the debugging praetice of FIG -480/13.7 - L.MG21 type CFB boiler (burning Yangquan anthracite),puts forward the following debugging optimization scheme of:air quantity calibration, high temperature refractory curing, steam blow - cleaning, furnace heating surface protection,going into operation time and mode of loop seal system, going into operation of main fuel, coalfeeding control and under - bed igniting burner etc.
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30