检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王书良[1]
出 处:《杨凌职业技术学院学报》2006年第3期7-9,共3页Journal of Yangling Vocational & Technical College
摘 要:高速公路软土地基路段采用预压等措施处理并通车运行后,通过对纵横断面的变形监测和测量数据分析,该路段在设计年限路面最大沉降量符合规范要求,横断面路拱的横坡变化与车荷载及地基处理措施等因素有关。The preloading approaches were adopted on soft earth foundation of the highway and after its being open to traffic, the highway's maximum settlement in fixed number of year accorded with the requirement through the analysis of deformation monitoring of vertical section and transect and measured data. The cross slope gradient of arch bridge has relations with car loading and foundation treatment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.35