检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江大学土木工程系,浙江杭州310027 [2]杭州天元建筑设计研究院,浙江杭州311201
出 处:《岩土工程学报》2006年第10期1288-1291,共4页Chinese Journal of Geotechnical Engineering
摘 要:对锚杆抗拔力试验p-s曲线用最小二乘法作多项式拟合,并根据土层锚杆与挡土桩交点变形协调关系建立非线性方程组,联立求解可以得到挡土桩的水平位移。本文进一步以挡土桩最大水平位移为约束条件,以锚杆布置间距等作为变量,以挡土桩的最小刚度为目标函数进行优化。最后给出了优化实例。Multinomial fitting equations of experimental p - s curve of soil anchors were obtained with the method of the least squares, then according to the compatibility of deformation of the crossing point of soil anchors and earth-retaining pile wall, the nonlinear equations were proposed. Solving the above simultaneous equations, the horizontal displacement of the earth-retaining pile wall could be obtained. The optimum design of above problem was discussed where the maximum horizontal displacement of the earth-retaining pile wall was taken as the constraint condition, the interval of the soil anchors as variables and the minimum stiffness of the earth-retaining pile wall as the target function. In the end, an optimizing example was given.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.114.251