检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学工程学院测绘工程系,武汉430074 [2]广东省基础工程公司,广州510620
出 处:《工程地球物理学报》2006年第4期304-309,共6页Chinese Journal of Engineering Geophysics
摘 要:介绍了盾构机姿态测量的人工测量方法和自动测量方法,通过实际工程数据分析比较这几种测量方法的精度,从精度、可操作性方面考虑选择自动测量方法进行施工测量,采用人工测量方法来检校自动测量的准确性。在保证测量精度的前提下,人工测量侧重于控制测量部分,自动测量使用于施工测量部分,两种方法有机结合,确保盾构隧道高精度贯通。This paper has presented several shield posture measurements such as manual measurement and automatic measurement methods which are commonly used in projects, it compares these measuring techniques by analyzing precision and convenience and chooses the best measurement method. Artificial methods which are used to measure the accuracy of measurements made more automatic. Ensuring the accuracy of measurement, automatic measurement is used in construct surveying and artificial measurement is used in control surveying. In practical project two measurements were implemented with great efficiency and speed.
分 类 号:TB22[天文地球—大地测量学与测量工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28