工程建设项目绩效评价的二级挣值分析方法  被引量:13

Research on Second-level Earned Value Method For Improve Evaluation of Performance of Engineering Project

在线阅读下载全文

作  者:长青[1] 吉格迪[2] 陈建辉[2] 

机构地区:[1]天津大学管理学院,天津300072 [2]内蒙古工业大学管理学院,内蒙古呼和浩特010051

出  处:《工业工程与管理》2006年第5期76-80,共5页Industrial Engineering and Management

基  金:国家自然基金项目(70662001)

摘  要:传统挣值法注重整体分析与预测而忽略了项目内部工作的执行情况,在对项目执行绩效进行评价时,极易出现评价结果与实际执行相背离的情况。本文在对传统挣值法理论进行改进的基础上提出了一种项目绩效评价方法———二级挣值法。该方法能改进传统挣值法在预测工期、成本方面产生的偏差,并且与传统挣值方法相比,增加了更多的原因分析信息。Earned value method (EVM) is widely used in project management. However, traditional EVM shows more and more deficiencies and limitations in modern project management . It is mainly generalized that traditional EVM pays more attention to analyze and forecast whole project, but neglects performance of internal activities. As a result, it is easily found that ap- praisal conclusion deviates from real case. Based on the disadvantages and limitations of traditional earned value method, a practical method, namely, the second-level earned value method is put forward which improves the traditional EVM. The new method can provide more information for analyzing the reasons of deviation on duration and cost forecast.

关 键 词:工程建设项目 绩效评价 二级 挣值法 执行情况 评价结果 评价方法 传统 

分 类 号:F284[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象