检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津大学管理学院,天津300072 [2]内蒙古工业大学管理学院,内蒙古呼和浩特010051
出 处:《工业工程与管理》2006年第5期76-80,共5页Industrial Engineering and Management
基 金:国家自然基金项目(70662001)
摘 要:传统挣值法注重整体分析与预测而忽略了项目内部工作的执行情况,在对项目执行绩效进行评价时,极易出现评价结果与实际执行相背离的情况。本文在对传统挣值法理论进行改进的基础上提出了一种项目绩效评价方法———二级挣值法。该方法能改进传统挣值法在预测工期、成本方面产生的偏差,并且与传统挣值方法相比,增加了更多的原因分析信息。Earned value method (EVM) is widely used in project management. However, traditional EVM shows more and more deficiencies and limitations in modern project management . It is mainly generalized that traditional EVM pays more attention to analyze and forecast whole project, but neglects performance of internal activities. As a result, it is easily found that ap- praisal conclusion deviates from real case. Based on the disadvantages and limitations of traditional earned value method, a practical method, namely, the second-level earned value method is put forward which improves the traditional EVM. The new method can provide more information for analyzing the reasons of deviation on duration and cost forecast.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28