机构地区:[1]School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiaotong University, Shanghai 200030, China [2]Shanghai Municipal Engineering Design Institute, Shanghai 200092, China
出 处:《Journal of Hydrodynamics》2006年第5期613-619,共7页水动力学研究与进展B辑(英文版)
基 金:Project supported by the National Natural Science Foundation of China (Grant No: 40201024)
摘 要:A complex seepage flow field with unknown free surface was formed in the Shanghai Laogang Municipal Solid Waste (MSW) Landfill by the perimeter cut-off wall around the landfill site and the Prefabricated Vertical Drains (PVD) in the foundation of landfill. First, the equivalent vertical permeability was presented based on the drainage mechanism of PVD and the related calculation method was studied to macroscopically reflect the impact of PVD on the seepage flow status of the landfill foundation. With the influence of the cut-off wall and the PVD on the infiltration of groundwater, the total inflow was classified into two parts: the lateral inflow through the cut-off wall outside the landfill, and the upward infiltration through the PVD from the foundation of the landfill. Seepage analysis was conducted using the finite element method according to the actual scenario of Laogang Landfill, and the lateral infiltration and the upward infiltration were calculated, respectively. The results show that the total inflow into the landfill area was mostly supplied by the upward infiltration through the PVD and the perimeter cut-off wall was significantly effective to depressurize the seepage pressure and to reduce the flow rate.A complex seepage flow field with unknown free surface was formed in the Shanghai Laogang Municipal Solid Waste (MSW) Landfill by the perimeter cut-off wall around the landfill site and the Prefabricated Vertical Drains (PVD) in the foundation of landfill. First, the equivalent vertical permeability was presented based on the drainage mechanism of PVD and the related calculation method was studied to macroscopically reflect the impact of PVD on the seepage flow status of the landfill foundation. With the influence of the cut-off wall and the PVD on the infiltration of groundwater, the total inflow was classified into two parts: the lateral inflow through the cut-off wall outside the landfill, and the upward infiltration through the PVD from the foundation of the landfill. Seepage analysis was conducted using the finite element method according to the actual scenario of Laogang Landfill, and the lateral infiltration and the upward infiltration were calculated, respectively. The results show that the total inflow into the landfill area was mostly supplied by the upward infiltration through the PVD and the perimeter cut-off wall was significantly effective to depressurize the seepage pressure and to reduce the flow rate.
关 键 词:Municipal Solid Waste (MSW) landfill foundations of landfill cut-off wall Prefabricated Vertical Drain (PVD) lateral infiltration upward infiltration finite element analysis
分 类 号:TV131.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...