检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付东林[1] 薛斌义[1] 叶得金[1] 佟成利[1] 贾贵义[1] 李爱军[1] 刘如珍[1]
机构地区:[1]甘肃省地质调查院,兰州730000
出 处:《水文地质工程地质》2006年第6期104-106,共3页Hydrogeology & Engineering Geology
基 金:甘肃严重缺水地区地下水勘查示范项目
摘 要:文章分析了石羊河下游咸水区人饮水成井中存在降低井水含砂量,避免上部咸水与下部淡水相串两个关键性技术问题。通过孔径与管径的调配设计,增大环状粒料层和止水粘土层的厚度;滤水管外包尼龙纱网;粒料与止水粘土接触界面上设计反滤层;填粒后先行拉活塞利用水力夯实粒料层,再投粘土球止掉上部咸水等措施,在民勤县三口人饮水井施工中取得显著效果,证明了该套成井工艺的有效性和可行性,有望为同类地区人饮水井施工提供技术示范作用。The article suppling in salt-water mixing the upper salt analyzes the important problems existing in the well completion technologies for drinking-water area on the lower Shiyanghe river basin, which reduces sand content of well water and avoids water and the lower fresh water. Designning well tube and drill-hole diameter in order to increase thickness of both annular packing gravel and water-resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water-resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt-water resisting etc. we succeeded in constructing 3 drinking-water wells in Minqin County, proved the affectivity and feasibility of using it and giving a certain technical demonstration of aonstruction of drinking-water well in the same similar to this area.
分 类 号:TV222.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.191