检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国市政工程中南设计研究院,湖北武汉430010
出 处:《中国给水排水》2006年第22期55-57,共3页China Water & Wastewater
摘 要:介绍了百乐克(B IOLAK)工艺的工艺流程及特点,并提出在实际运行中该工艺存在缺少沉砂预处理步骤、脱氮效果不稳定、二沉池沉淀效果不理想等问题,针对于此提出了优化设计方案,包括增加沉砂预处理系统、设置独立脱氮区、在沉淀池后增设稳定池等措施,并已应用于工程实际。The flow and characteristic of BIOLAK process were introduced, and existing problems in practice about shortage of grit chamber as pre-treatment, unsteady nitrogen removal effect and imperfect settling effect of secondary sedimentation tank were presented. Aim at these problems, the optimal design was put forward, including adding a grit chamber as pre-treatment system, setting an independent nitrogen removal area, adding a stabilization tank after sedimentation tank, etc., also these improvements were put into practice.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.45