检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州理工大学土木工程学院,甘肃兰州730050
出 处:《岩土工程学报》2006年第B11期1582-1585,共4页Chinese Journal of Geotechnical Engineering
摘 要:框架预应力锚杆是近年来较好地应用于黄土边坡加固的支挡结构,但其设计理论依据仍不统一,未形成成熟的规范,并且只把锚杆的预应力作为一种安全储备,没有进行具体的计算。基于此,考虑结构与土的相互作用,根据施工过程把设计分为基坑开挖和工作两个阶段,提出了一种侧移控制的设计方法,可以合理地确定施加预应力的大小。应用该方法对某工程实例进行了设计分析,结果表明:合理地确定锚杆预应力的大小是必要的,这对框架预应力锚杆的合理设计具有重要意义。In recent years, the flame supporting structure with pre-stressed anchor bars has been the better supporting structure used in reinforced loess slopes, however, its design theory is still not uniform and there is no codes to be followed, the pre-stress of anchor bars is only regarded as a safety reserve, and its calculation is ignored. For this, a lateral displacement controled design method, considering the interaction between the structure and the soils, was proposed to ensure the pre-stress reasonably, the design process was divided into excavation and work stages according to the construction. An engineering case was designed and analyzed using the method. The results show that it is necessary to determine the pre-stress of anchor bars, and it is of great significance for the rational design of frame supporting structure with pre-stressed anchor bars.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222