检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2006年第4期38-41,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:在分析环境地质条件基础上,对永定新河防潮闸工程存在的地基沉降、地基液化、饱和软土震陷等主要工程地质问题进行了评价,分析了软土地区工程勘察方法及存在的问题。采用多种方法确定地基承载力和压缩模量等力学指标,并进行分析对比,就各种方法对一般粘性土、淤泥质土和砂性土等不同土层的适用性作出评价。The main engineering geological problems, such as foundation settlement, foundation liquefaction, saturation soft soil and quake collapse existed in Yongdingxinhe river tide gate project are evaluated on the basis of analyzing the environmental geological condition. The engineering exploration method in soft soil area and the existing problems are also analyzed, at the same time, many kinds of methods are adopted to determine the bearing capacity of the foundation and the modulus of compressibility and also the analyze and comparison are conducted for them. The adaptability of different soil layers, such as normal cohesive soil and muddy soil are also evaluated.
关 键 词:防潮闸 饱和软土 沉降 地震液化 震陷 永定新河
分 类 号:TV221.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249