检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何思明[1]
机构地区:[1]中国科学院水利部成都山地灾害与环境研究所,四川成都610041
出 处:《山地学报》2006年第5期574-579,共6页Mountain Research
基 金:国家自然科学基金项目(40572158)
摘 要:针对高切坡施工常常导致边坡失稳破坏,诱发滑坡发生的现象,提出采用超前支护桩整治不稳定高切坡的设计理论。采用解藕方法研究了超前支护桩与开挖坡体之间的相互作用机制,其中高切坡开挖面采用弹性理论分析;超前支护桩采用可以考虑桩侧向土体屈服的弹塑性理论进行桩的内力理论解,根据两者之间荷载变形关系建立联系求解,为高切坡超前支护桩的设计提供依据。结果表明:桩土相互作用力大于常规主动土压力,与边坡开挖量、开挖高度、支护桩的刚度以及土体性质等因素密切相关。Slope failures or even landslides are often triggered by improper excavation in high slopes construct. The pre-reinforced pile is presented to use to reinforced high cutting slope. In this paper, the interaction mechanism of pile/soil is study according to uncouple method, the deformation of the high cutting is calculated using elastictheory, and the deformation of the pre-reinforced pile is computed used elastic-plastic theory take account on, then to build the equation groups according the load and deformation relation. The analysis demonstrates that the respond of pile/slope is controlled by cutting amount, high of slope, stiffness of pile as well as soil property, and the distrihuted load along pile is more high than general active pressure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195