检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第三航务工程勘察设计院
出 处:《交通世界》2006年第11A期82-83,20,共2页Transpoworld
摘 要:Sulfur Exclusion System of Taichang Huaneng Electric Plant is the second phase project. Its annual demand of limestone amounts to 168 thousand tons. 282.1 thousand tons of waste gypsum will be conveyed to the plant by water with 500DWT barge. Since the dock for the first phase project is only used as the unloading oil berth in peak working time with one unloading vessel each month. Therefore, the plant has arranged the unloading and loading berth here for limestone and gypsum, maintaining the loading work of oil.Sulfur Exclusion System of Taichang Huaneng Electric Plant is the second phase project. Its annual demand of limestone amounts to 168 thousand tons. 282.1 thousand tons of waste gypsum will be conveyed to the plant by water with 500DWT barge. Since the dock for the first phase project is only used as the unloading oil berth in peak working time with one unloading vessel each month. Therefore, the plant has arranged the unloading and loading berth here for limestone and gypsum, maintaining the loading work of oil.
关 键 词:卸船码头 脱硫系统 石灰石 电厂 石膏 工艺 二期工程 重件码头
分 类 号:U654.93[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.180