机构地区:[1]同济大学地下建筑与工程系,上海200092 [2]西安建筑科技大学土木工程学院,710055
出 处:《建筑结构》2006年第11期13-15,共3页Building Structure
摘 要:因黄土地基湿陷沉降,某建筑物发生了倾斜沉降,经过分析论证,采用静压桩托换实施顶升纠倾方案。设计采用400根托换桩,切割部分筏板基础,减小顶升压力。沿建筑物长度方向分三次一循环实施顶升,合理控制了顶升过程的稳定问题。该纠偏加固工程实施顺利,效果明显,解决了地基湿陷的问题,达到了纠偏的目的,证明了该顶升纠偏工程设计的合理性,可以作为同类纠偏加固工程的借鉴。Leaning and settlement appeared in a building for loess foundation settlement. The design method using underpinned pile for jack lifting and leaning rectification is adopted. The design had used four hundred underpinned piles, and a part of buoyant foundation was cut. The jack lifting had three times for a circle, and the stable problem of jack lifting was controlled. The engineering was finished successfully, and it had important reference meaning.
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.249.33