检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥勘测设计院有限公司东南桥梁诊治研究中心,江苏南京210003
出 处:《桥梁建设》2006年第A02期183-186,共4页Bridge Construction
摘 要:以体外预应力在江阴大桥北引桥(50+75+46.5)m连续箱梁加固中的应用为例,介绍体外预应力筋在箱梁结构中的布置形式、锚固、转向的方式以及张拉方法。通过对箱梁结构的竖向位移和混凝土应力的监测,分析该桥体外预应力加固的效果。分析结果表明,体外预应力改善了箱梁混凝土的应力状态和桥面线形,对结构的补强起到了良好的效果。Taking the application of external prestressing to the strengthening construction of the (50+75+46.5)-m span continuous box girder structure of the north approach spans of Jiangyin Bridge for example, this paper presents the layout, ways of anchoring and draping of the prestressing tendons in the girder structure and methods for tensioning of the tendons. In accordance with the monitoring of vertical displacement of the structure and concrete stress thereof, the effect of strengthening of the approach spans with the external prestressing is analyzed. The results of the analysis indicate that the external prestressing has improved the stress conditions of the concrete of the girder structure, geometry of bridge deck and sound effect of strengthening of the approach spans has been achieved.
分 类 号:U445.72[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28