检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都成都勘测设计研究院院,成都610072 [2]长江科学院岩基研究所,武汉430010
出 处:《地下空间与工程学报》2006年第6期895-898,共4页Chinese Journal of Underground Space and Engineering
摘 要:为了确定雅砻江官地水电站地下厂房区初始地应力场,并为厂房及洞室系统的优化布置提供依据,在地下厂房区6个部位各布置了一个钻孔,采用空心包体式钻孔应变解除法进行了三维地应力测量。测试结果表明:最大主应力量值为20~22MPa,属中高应力区,最大水平主应力方向在NW^NNW之间。最大水平主应力与地下洞室初期布置方向夹角近90,°不利于洞室围岩的稳定性。为此,从综合考虑地应力和地质构造条件的角度,提出了调整地下厂房布置方向的优化建议。In order to determine the in - situ stress field of Guandi Hydropower Plant's underground powerhouse, situated on Yalong River, and to provide data for optimal arrangement of powerhouse and relevant tunnel system, three dimensional over - coring stress measurements using hollow inclusion tfiaxial gauge have been conducted in 6 boreholes at different location in the area of underground powerhouse. Results reveal that the stress level is qualified as middle to high with maximum stress magnitude of 20 ~ 22 MPa, the direction of maximum horizontal stress :is at NW ~ NNW. The direction of maximum horizontal stress is nearly perpendicular to that of the powerhouse's initial arrangement axis, so it is unfavourable to the stability of surrounding rock mass. Therefore an improved arrangement scenario about adjusting the axis of underground powerhouse is thus proposed on basis of comprehensive consideration of initial stress and geo - structural conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31