准好氧填埋垃圾渗滤液全循环处理的影响因素研究  被引量:6

Study on Influencing Factors of Landfill Leachate Treatment by Quasiaerobic Full-scale Leachate Recirculation

在线阅读下载全文

作  者:曾晓岚[1] 龙腾锐[1] 丁文川[1] 张磊磊[1] 

机构地区:[1]重庆大学城市建设与环境工程学院,重庆400045

出  处:《中国给水排水》2006年第23期63-66,共4页China Water & Wastewater

摘  要:对准好氧垃圾填埋所产生的垃圾渗滤液进行全循环处理,考察了水力负荷和回灌次数对渗滤液除污效果的影响。正交试验结果表明,水力负荷是影响渗滤液中污染物去除效果的关键因素,回灌次数则为次要因素;较优的水力负荷和回灌次数分别为15.9 L/(m2.d)和3次/d,此时对渗滤液中COD、BOD5、NH4+-N的去除率分别为99.3%、99.7%和98.7%。An orthogonal test simulating quasi-aerobic full-scale landfill leachate recirculation was conducted. The factors influencing leachate treatment investigated were the hydraulic load and recirculation frequency. The results show that the hydraulic load is the critical factor in determining the pollutants removal. Hence, the recirculation frequency is the secondary factor. The optimal hydraulic load and recirculation frequency concluded are 15.9 L/(m^2 · d), and 3 times/d, respectively. The removal percentages of COD, BOD5 , NH4^+ - N under the conditions are 99.3% , 99.7% , 98.7% , respectively.

关 键 词:垃圾渗滤液 准好氧填埋 全循环处理 水力负荷 回灌次数 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象