水布垭面板坝智能土石方调配系统研究  

Research on Intelligent Earth-rock Volume Allocation System for Shuibuya Concrete Face Rockfill Dam

在线阅读下载全文

作  者:蒋从锋[1] 赵颖辉[2] 

机构地区:[1]华中科技大学工程计算与仿真研究所,武汉430074 [2]华中科技大学水电与数字化工程学院,武汉430074

出  处:《长江科学院院报》2006年第6期68-71,共4页Journal of Changjiang River Scientific Research Institute

摘  要:由于水布垭面板坝的土石方开挖量超过2000万方,填筑量超过1560万方,土石方调配问题关系到整个工程的进展和技术经济效益,为此分析了水布垭面板坝土石方调配的特点,并根据数学模型,对水布垭面板坝智能土石方调配系统进行了功能分析和系统设计。计算机仿真结果表明,该系统具有很好的实用性和可操作性,响应时间约0.5~1S,优于传统土石方调配结果。Total excavation volume of Shuibuya Project exceeds 20 million cubic meters and total filling volume of the dam is more than 15.60 million cubic meters. Its whole process and technic-economic benefit are considerably influenced by the earth-rock volumes allocation problem. Through analyzing the features of earth-rock volumes allocation of Shuibuya Project, an intelligent earth-rock volume allocation system was developed to model earth-rock allocation in construction. The results of computer simulation are technically feasible and better than those of traditional ways, and the response time of the database system is about 0.5 1.0 second.

关 键 词:水布垭面板坝 智能土石方调配 施工仿真 管理信息系统 地理信息系统 

分 类 号:TV541[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象