检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑俊杰[1] 包德勇[1] 龚彦峰[2] 资谊[2]
机构地区:[1]华中科技大学,湖北武汉430074 [2]铁道第四勘察设计院,湖北武汉430063
出 处:《铁道工程学报》2006年第8期80-84,共5页Journal of Railway Engineering Society
摘 要:研究目的:解决新建隧道近距离穿越既有隧道时,既保证新建隧道施工安全,又能使既有线正常运营的问题。研究方法:针对温福铁路琯头岭隧道下穿既有高速公路隧道工程的实际情况,结合国内外研究成果和国家现有规程,在分析既有隧道健全度及施工对策的基础上,对交叉点附近新建隧道的施工方案及既有高速公路隧道的监控量测措施进行了分析研究。研究结果:得出了几种施工技术和相应的参数、控制标准。研究结论:(1)近距离爆破振动施工可能会产生严重危害,必须引起高度重视,因此,琯头岭隧道穿越段施工之前,应对既有隧道衬砌强度、衬砌背后空洞分布、衬砌抗震性等进行必要的评估,制定爆破振动控制基准,进行合理的爆破参数研究。(2)在新建隧道掌子面推进到离交叉点3~4倍洞径时,应开始做好既有隧道内的监控量测,通过监测分析结果,合理调整开挖方法、爆破参数及起爆方式,确保既有隧道安全。(3)交叉段施工完成之后,对既有隧道交叉点附近隧道衬砌结构应重新进行安全性评价,确保既有隧道不会因时间推移而产生破坏。Research purposes: The purposes are to ensure the construction safety of newly - built tunnel and make existing road open to traffic usually while the newly -built tunnel underneath passes existing tunnel nearby. Research methods: According to the real construction situation of Guantouling Tunnel underneath passing existing expressway tunnel on Wenzhou- Fuzhou Railway Line and in combination with the research achievements at home and abroad, and current state codes, the analysis and research have be made on construction scheme for newly building a tunnel around cross point and on measures for monitoring and measuring the existing expressway tunnel based on the analysis of integrity level of existing tunnel and construction countermeasures. Research results: Several construction techniques and their relative parameters and control standard are presented. Research conclusions: (1) More attention should be paid to the serious harm probably caused by blast vibration nearby. Therefore, it is necessary to evaluate the lining strength of existing tunnel, cavity distribution behind lining and earthquake resistant behaviour of lining, to work out the basic control standard for blast vibration and make research on rational blast parameters before construction of intersection of Guantouling Tunnel. (2) When the working face of newly - built tunnel approaches to hole diameter of 3 - 4 times from cross point, the monitoring and measurement in the existing tunnel should be done well. With the analysis result of monitoring, the adjustments should be made rationally of excavation way, blast parameters and method of ignition in order to ensure the safety of the tunnel. (3) After finishing the construction of intersection, the safety should be re - evaluated to tunnel lining structure near the cross point of existing tunnel in order that the tunnel will not be damaged with time passing by.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117