摘  要:采用高压旋喷桩及SMW工法桩加固隧道上方软土地基,可减少基坑土体卸载在时间和空间上的不均衡性引起隧道纵向产生不均匀的变形;运用时空效应理论进行分析,确定一次性卸载量、卸载范围及沿隧道纵向的卸载次序,拟定基坑开挖方案;施工阶段结合监测数据进一步优化、调整开挖次序,使隧道变形曲线趋于缓和。High-pressure rotating jet-grouted piles and SMW constructed piles were used to reinforce the soft ground above the tunnel, which could reduce the uneven longitudinal deformation of the tunnel caused by the unbalanced unloading of the pit soil in space and time. With the help of time-space effect theory, unload- ing volume of one time, unloading range, and unloading orders along the tunnel, were determined and pit excavation plan was prepared. During the construction period, the excavation sequence was further optimized and adjusted according to the on-site monitoring data to lessen the tunnel deformation.

关 键 词:基坑 软土地基 卸载 

分 类 号:TU753.62[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象