面粉厂制粉车间的控制爆破拆除  被引量:1

DEMOLITION OF PROCESSING WORKSHOP OF A FLOUR MILL BY CONTROLLED BLASTING

在线阅读下载全文

作  者:毛益松[1] 傅光明[1] 夏军[1] 李必红[1] 夏长青[1] 

机构地区:[1]国防科学技术大学,长沙410073

出  处:《工程爆破》2006年第4期41-43,共3页Engineering Blasting

摘  要:拟爆破拆除的面粉厂制粉车间由麦仓、加工车间和粉仓组成,根据其结构比较特殊、环境较复杂、难度较大的特点,采取麦仓向西侧、加工车间和粉仓向南侧定向倒塌的爆破方案。由于设计了合理的炸高、爆破参数和爆破网路,采取了有效的安全防护措施,爆破拆除达到预想的效果。The Flour Mill to be demolished by controlled blasting comprised wheat storehouse, processing workshop and flour storehouse, which were in special construction structures, and erected in complex surroundings, its demolition tended to be hard to operate. The scheme of collapse of the wheat storehouse westward and the flour storehouse and the processing workhsop southward was adopted. The reasonable blasting height, blasting parameters and initiation network along with the safety protection measures were designed for this demolition so as to reach an ideal blasting effect.

关 键 词:制粉车间 爆破拆除 爆破参数 爆破效果 

分 类 号:TU746.5[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象