三峡水轮发电机组最大容量和设临时转轮问题  

Problems on the maximum Capacity of Three Gorges Turbine Generating Sets and Runners Installed Temporarily

在线阅读下载全文

作  者:商轲 黄奋杰 青长庚[1] 吴次光[1] 

机构地区:[1]鲁布革水电科技实业公司,电力部昆明勘测设计院

出  处:《云南水力发电》1996年第3期60-62,共3页Yunnan Water Power

摘  要:三峡机组运行水头变幅大,为避免高水头小开度运行出现不稳定问题,宜设置最大容量.三峡水库因施工和移民安排分期蓄水,为使在较低水位的运行初期获得更多的经济效益,宜在最早投运的一批机组设置临时转轮.Since the operating head of Three Gorges generating sets have large variable amplitude,it is better to provide the generating sets with maximum capacity to avoid arising unsteady state while they are operating under high head and small apertures. Filling of Three Gorges reservoir has to be arranged by stages because of construction and resettling the migrations,so it is suitable to provide termporary runners for some generating sets in the early stage to increase more economic benefits at lower water levels during the initial operating period.

关 键 词:稳定运行 最大容量 临时转轮 水轮发电机组 

分 类 号:TM312.02[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象