检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江机电职业技术学院电气工程系,浙江杭州310053
出 处:《工矿自动化》2006年第6期16-19,共4页Journal Of Mine Automation
摘 要:研究了采用高漏抗变压器型可控电抗器作为新型的配电系统自动调整消弧线圈的自动跟踪补偿装置的问题。该装置的控制采用动态补偿方案,实时监测电网电容电流。在正常工作时,补偿装置远离谐振点,当发生瞬时性单相接地故障时,补偿装置实现快速补偿。仿真结果表明:以该原理构成的自动跟踪补偿装置具有伏安特性线性度优良、响应速度快、补偿效果好、对系统适应性强、经济性能指标良好等优点。Using controlled reactor of transformer type with high leakage reactance as new automatic tracking compensation device of distribution system was studied in the paper, which could automatically adjust arc suppression coil. The device's control adopted the scheme of dynamic compensation, which could monitor the capacitive current of power net in real time. In normal working, the device was far from the resonance point. When the fault of instantaneous single phase grounding happened, the device could compensate quickly. The result of simulation showed that the automatic tracking compensation device had some advantages such as good linearity of voltage-current characteristic, quick response speed, good compensation effect, strong adaptability, good performance index, etc.
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222