检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京国电水利水电工程有限公司,北京100024
出 处:《云南水力发电》2006年第6期33-34,37,共3页Yunnan Water Power
摘 要:云南土卡河水电站是一个中型水电工程,拦河坝为碾压混凝土重力坝。在参考国内中型水电站的泄洪消能设计经验后,结合土卡河的洪水、地质条件、尾水条件及枢纽布置特点,在施工详图阶段,对枢纽的泄洪消能方式进行了优化,采取了台阶式溢流坝面加平尾墩及戽式消力池方案,水工模型试验表明该方案是合理的。The Tuka hydropewer project is a medium - sized hydropewer development with a miler compacted concrete gravity dam in Yunnan province, China. Taking into consideration the flood, geological and tailrace conditions, as well as the layout of the project, the way of flood discharging and energy dissipation of the project complex was optimized at the construction details design stage by reference to the flood discharging and energy dissipation design experience of other medium - sized hydmpower projects of its kind at home. The hydraulic model test indicates that the adoption of a stepped spillway face with flat baffle piers and a bucket basin has proved reasonable.
分 类 号:TV135.2[水利工程—水力学及河流动力学] TV653
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.176.130