检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王固琴[1]
出 处:《建筑经济》2006年第12期37-39,共3页Construction Economy
摘 要:2003年2月17日,建设部以国家标准形式发布《建设工程工程量清单计价规范》,并于7月1日起实施。然该计价模式推行三年多来,由于中国工程造价管理不完善,实际应用中还存在许多问题。本文通过对加拿大工程造价管理的介绍,同时与中国工程造价进行对比,借鉴加方工程造价管理经验,提出弥补我国工程造价管理不足的建议,以适应我国正在推行的工程量清单计价规范,最终达到与国际接轨的目的。Ministry of Construction released "the norm of project amount list valuation in construction" in the form of national standard on February 17, 2003, and has implemented it since July 1. However, the valuation mode is proved to have some problems because of the faultiness of China's project cost management for 3 years. This paper puts forward some suggestions to remedy the shortage of project cost management in our country according to the introduction of project cost management of Canada, the comparison with China and the reference of Canada's experience. These suggestions aim to adapt to the implementation of the norm of project amount list valuation and promote its amalgamation with the international standard.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30