察汗乌苏面板堆石坝垫层料的生产及渗透特性研究  被引量:1

Preparation of cushion layer material for Chahanwusu Concrete Faced Rock-fill Dam and study on related seepage characteristics

在线阅读下载全文

作  者:王援生 何全生 苗喆[2] 

机构地区:[1]国电新疆开都河流域水电开发有限公司,新疆库尔勒841000 [2]西北勘测设计研究院,陕西西安710001

出  处:《水利水电技术》2006年第12期37-39,46,共4页Water Resources and Hydropower Engineering

摘  要:察汗乌苏水电站水库大坝为目前在建的河床趾板建在深厚覆盖层上国内首座百米级的混凝土面板堆石坝。大坝垫层料采用以天然砂砾料为主、掺入小石和粗砂以调整级配的方式生产。为掌握其特性,进行了颗粒级配分析、渗透和渗透变形等项试验,研究解决了以天然砂砾料为主的垫层料的水力学指标问题,满足了工程需要,可为类似工程应用提供参考。The dam for Chahanwusu Hydropower Station is the first one among the concrete faced rock-fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in China. The cushion layer for the dam is constructed with the material prepared mainly with natural sandy gravel and mixed with proper amount of pebble and coarse sand. In order to know the characteristics of the material, analysis on the particle gradation and the related tests on seepage and seepage deformation are made, with which the problems related to the cushion layer material mainly composed of the natural sandy gravel are solved, and the construction demand is met as well, which can provide a reference for the other similar project.

关 键 词:察汗乌苏面板堆石坝 垫层料配制 渗透试验 

分 类 号:TV641.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象