作 者:郭彦林[1] 刘学武[1] 张庆林[1] 刘禄宇[1] 窦超[1]
机构地区:[1]清华大学,北京100084
出 处:《施工技术》2006年第12期1-6,共6页Construction Technology
摘 要:对大型复杂钢结构施工过程中存在的力学问题进行了剖析,探讨了解决这类问题的思路和方法。针对CCTV新台址主楼“塔楼倾斜”、“空间连体”及“大悬臂”的构成特点,通过施工分析给出了结构在施工过程中的安装变形预调值以及幕墙的变形情况,作为主楼施工及安装的重要依据。This paper pointed out many mechanical problems encountered during the construction process for a large and complex steel structure, and their solving methods were outlined and discussed. For the new CCTV headquarters, the deformations produced due to the inclined towers and cantilevered structure system during the construction process were analyzed and traced according to the specified construction approach and sequence, and they have been used as guidelines for the steel structure erection and construction, as well as for glass curtain wall design and erection.
关 键 词:钢结构 施工过程 CCTV新台址主楼 变形预调值
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15