国家体育场钢结构屋盖落架过程模拟分析  被引量:47

Simulating Analysis of Removing Temporary Supports for Steel Structural Roof in National Stadium

在线阅读下载全文

作  者:郭彦林[1] 郭宇飞[1] 高巍[1] 刘学武[1] 李久林[2] 

机构地区:[1]清华大学,北京100084 [2]北京城建集团,北京100088

出  处:《施工技术》2006年第12期36-40,73,共6页Construction Technology

摘  要:首先对大跨度钢结构的落架过程进行了简单分析,并给出了落架应遵循的基本原则。其次,针对大跨度钢结构的落架,提出了同步协调和分组分步两种落架方式;结合国家体育场的施工方案,对其落架方案进行了详细分析。最后,采用等效弹性杆端位移法,基于ANSYS有限元软件,对国家体育场的落架进行了全过程模拟分析,通过“从外到内”和“从内到外”两种落架顺序计算结果的对比,证明前者是一种合理的落架顺序。The steel structural roof of National Stadium is comprised of enormous special main trusses with bracings of secondary structural members, and its erection scheme utilized the method of establishing temporary supports to the steel roof. Firstly, some basic rules of removing temporary supports from steel roof was presented and discussed. Then, the process of removing temporary supports was simulated by ANSYS software package by imposing the equivalent axial displacements at the temporary support ends. The comparisons were made between calculation results of two kinds of removing temporary support sequences, from outer to inner and from inner to outer, respectively. The former is verified to be a reasonable sequence, and it was applied in removing temporary supports in National Stadium.

关 键 词:国家体育场 落架 钢结构 屋盖 

分 类 号:U391[交通运输工程] TU758.11[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象