机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]中国水电顾问集团西北勘测设计研究院,陕西西安710065
出 处:《水电能源科学》2006年第6期46-48,共3页Water Resources and Power
摘 要:根据渗流分析确定了老虎嘴水电站左岸防渗墙上下游的水压力荷载,应用非线性有限元计算得到了施工期、蓄水期以及地震情况下的坝基沉降和防渗墙位移、应力等,论证了该方案在技术上是合理可行的。采用渗流分析所得的防渗墙上下游水压力作为结构分析的荷载,计算结果能更准确地反映防渗墙的实际受力情况。The structure of the 80 m hight impervious wall in left bank of Laohuzui Hydropower station is complex.Its right part connects with bedrock but the left part is hanging.Based on the 3-dimensional seepage analysis,the ground water pressure acted on the impervious wall is determined firstly for the optimal plan of seepage control.By use of the non-linear 3-dimensional FEM,the settlements of dam foundation and deformation and stress of impervious wall in the stages of construction and water impoundment and earthquake are obtained.It is proved that the design scheme of impervious wall is feasible and reasonable in technology.Here,it is more efficient for modelling the underground water pressure acted on the impervious wall by the seepage analysis.
分 类 号:TV543[水利工程—水利水电工程] TV139.14
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143