330 kV罐式断路器大修评估模型初探  

Probe of 330kV Pot Breaker Major Overhaul Evaluating Model

在线阅读下载全文

作  者:孟可风[1] 张志胜[2] 张仲秋[1] 

机构地区:[1]青海电力试验研究所,青海西宁810008 [2]海东供电公司,青海平安810600

出  处:《青海电力》2006年第4期11-12,60,共3页Qinghai Electric Power

摘  要:通过前期对330 kV SF6开关设备运行情况的评估分析,结合大修,填补了青海省电力系统对330 kV高压开关设备的大修空白,积累了SF6罐式断路器现场解体检修经验,对青海省电力公司系统中运行的罐式开关性能状况的分析、判断提供了参考依据,为青海省电力公司系统下一步的SF6开关大修工作打下坚实的基础。Through analyzing and evaluating the operating situation of 330kV SF6 switchgear equipment in the preceding period, and combining with the major overhaul practice, the paper fill the major overhaul blank of 330kV overvoltage switchgear equipment in Qinghai Electric Power Company, and accumulates overhaul experience of SF6 pot breaker field dismantling. The paper providing basis for analyzing and estimating the operating pot switchgear performance in Qinghai Electric Power Company, and sets a firm foundation for the further overhaul task of SF6 switchgear.

关 键 词:SF6罐式断路器 大修 探讨 

分 类 号:TM561.3[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象