检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:洪永文[1]
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《水力发电》2006年第11期54-56,共3页Water Power
摘 要:金安桥水电站枢纽工程位于强震地区,大坝地震设防烈度为9度,地震动峰值加速度为0.3995g。碾压混凝土重力坝最大坝高160m,地质条件复杂,坝基分布有4层凝灰岩、河床坝基主要为裂面绿泥化岩体、节理裂隙发育。介绍了碾压混凝土重力坝设计及主要技术问题。The complex structures of Jinanqiao Hydropower Station are located in an area having high earthquake intensity. The estimated seismic intensity for the dam is of degree IX with seismic dynamic peak acceleration of 0.3995g. The RCC gravity dam has a maximum dam height of 160m. Geological conditions in this area are relatively complicated. The dam foundation distributes four-layer tuff. Riverbed foundation is mainly composed of crack chloritite with joints being well developed. The essay mainly introduces technical issues in design of RCC gravity dam.
关 键 词:地震 地质 设计 碾压混凝土重力坝 金安桥水电站
分 类 号:TV642.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222