检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《水力发电》2006年第11期57-59,62,共4页Water Power
摘 要:高水头、长距离引水的水电站压力管道采用回填管形式可明显地降低工程造价,加快施工进度;同时,回填管回填土石后,能够恢复原来植被,保护生态环境,且较适于地形坡度小于20°地面布置。南梦3水电站压力管道属国内设计的首例水电站高水头回填管,其设计、施工及运行的成功实践具有较大的推广价值。For high-head and long-distance head conduit of hydroplant, using backfill-conduit form can reduce project cost and accelerate construction progress obviously. Moreover, the earth-rock backfill of head conduit can recover early plant cover, and the layout is fit for terrain where topographical falling gradient is less than 20 degrees. The head conduit of Nam Mang Ⅲ hydmpower station is the first high-head backfill-conduit designed by domestic designing institute, whose successful designing, construction and operating experience is worth generalizing.
分 类 号:TV732.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117