检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李玉括[1] 吕红霞[2] 陈韬[2] 陈军团[2]
机构地区:[1]西南交通大学信息科学与技术学院,成都610031 [2]西南交通大学交通运输学院
出 处:《铁路计算机应用》2006年第12期17-19,共3页Railway Computer Application
基 金:国家"十五"重点科技攻关项目(No.2002BA407B)
摘 要:介绍我国目前铁路线路施工方案编制和管理的现状,依据软件工程的理论,对铁路施工方案管理进行需求分析和数据流程分析,提出基于B/S模式的铁路施工方案管理信息系统架构模式。并对系统的设计目标、模块化结构、网络安全措施、数据库安全措施进行详细的分析与设计,最后简要阐述系统应用情况。It was fwstly introduced the status quo of prograrmming and managing railway construction plan in our country. Then, according to the software engineering theory, it analyzed the demand and data flow of railway construction plan management and presented the framework to set up Railway Construction Plan Management Information System, which was based on B/S model. System design objectives, modular structure, network security, database security measures carded out a detailed analysis and design. Finally, it was summary elaborated system applications.
分 类 号:U2[交通运输工程—道路与铁道工程] TP301.6[自动化与计算机技术—计算机系统结构]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15