检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周佩德[1]
机构地区:[1]江苏省射阳县环境监测站,江苏射阳224300
出 处:《环境科学与管理》2006年第9期11-12,19,共3页Environmental Science and Management
摘 要:在环境换取经济增长向环境优化经济增长转变的新形势下,应拓展建设项目环境保护设施竣工验收监测的内涵。指出目前的竣工验收监测对工业生产型建设项目的制约因素考虑不周、忽视了“三同时”的全过程、忽视了非工业生产型建设项目和区域性开发项目、忽视了无组织排放污染源。提出要创新治理设施竣工验收监测理念、优化竣工验收监测方法、强化竣工验收生态监测技术的研究、开展区域性建设项目的验收监测。Under the new situation in which environment trading for economic growth is transforming to optimizing economic growth, we should develop the connotation of completion of environmental facilities in construction projects. The article pointed out that the completion acceptance of environmental facilities in construction projects had considered a little about the restriction factors of industry production construction projects, which neglected "the three Simultaneous" process, the non - industry produc- tion configuration items of basic construction and the regional development projects as well as the pollution source discharging wan- tonly. The article suggested innovating the idea of approval monitoring for treating - facility, strengthening the technology research in environmental facilities completion and starting approval monitoring in regional development projects.
分 类 号:X328[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198