检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:祝于祥
机构地区:[1]浙江有色建设工程有限公司,浙江绍兴312000
出 处:《东华理工学院学报》2006年第4期370-372,共3页Journal of East China Institute of Technology
摘 要:锚杆静压桩托换技术施工采用分节压桩,整桩压入时压力不连续,区别于中长预制桩的压桩方式。压桩力受地层影响较为明显。特别是粘性土与砂性土中压桩,最终压桩力的大小有明显区别。在无试桩结果条件下,正确采用最终压桩力,是设计部门较为关心的问题,关系到是否满足单桩设计要求的问题。通过实例,依据基桩静荷载测试成果、小应变动测资料,对在砂性土中锚杆静压桩最终压桩力与设计单桩承载力值的关系,进行分析探讨,并在理论上作了粗浅的定性分析,本文在实际应用中,可作为取用或调整Kp值的依据。The anchored static pressure pile is different from the long prefabricated pile because the pile pressure is completed by segments and the pressure is discontinuous. The pressured pile is obviously affected by strata, especially, difference of the final pressure is apparent for the clayey and sandy soils. The final pressure of pile is a key problem for designing without the experiment. This paper demonstrates the relationship between the final anchored pressured pile in sandy soil and the designed single pile capacity based on the testing results of static load of basal pile, motion testing data of small strain. This testing result can used as the evidence for Kp value.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40